Background
The directors at Sherrington’s Leisure approached us to do a complete electrical fit out of their flagship bar in Wigan.
We were tasked with providing a complete turnkey package including general lighting and power, emergency lighting and dedicated power supplies to water heating, AC and cellar services.
In addition, we also designed, installed and commissioned the fire alarm, CCTV installation and sound system.
Challenges
Although the client had a vision of what the finished product should look like they had no design drawings or electrical requirement data from which we could formulate a proposal.
This required us to discuss many potential design options with the client along with all the mandatory requirements with regards building control.
Results
Through meaningful communication and a productive relationship with our client we successfully delivered their vision for ambient lighting, sound clarity and working services.
Customer Testimonial:
Phil Cox “Co – Owner”
“GSL were appointed to complete electrical works, they offered full design and installation package. The work was completed to a high standard and will be using them for future works.”
Phil Cox